Building Information Modeling will be key in future planning of infrastructure and living environments around the world. In a growing number of countries and cities BIM is mandatory for infrastructure projects, governmental tenders and the development of larger buildings.
Building Information Modeling represents the digitalization and process optimization of the real estate industry. Digital models have become the main driving force behind innovation and performance in the construction industry, urban planning and regional development.
In Dubai for example, BIM is mandatory for all larger projects. In the UK the government demands BIM for all its tenders. Singapore, Malaysia, Australia, Italy, Germany, Scandinavian countries, and many more, have announced BIM regulations for 2019 and 2020.
BIM is not just a "drawing". BIM is an information model, that is enriched during the whole process, by all stakeholders. For example: by environmental studies, legal information, licenses from local government, etc. BIM can be used from the first sketch, to the handover, when the model holds all information for maintenance. Not just the construction, but also all details on mechanical, electrical and plumbing engineering. Our viewer can, of course, show every detail.
This new collaborative working method for all stakeholders reduces mistakes. Some say that for this reason, costs could go down by 20%. Dynamically-updated information will pay a key role in interfacing between digital technologies, the various professional fields, built works and usage of data to improve operational efficiency and delivery of new services.
Client | Al Habtoor Engineering |
---|---|
Built-up area | 206,900 sq.ft |
Location | UAE |
The six residence towers will contain a total of 2,000 apartments, ranging from 1 to 4 bedrooms. These buildings will include the Mahara Tower, Lulwa Tower, Jumana Tower, Dana Tower, and the Omnix North and South Towers. The Mahara and Jumana Towers are currently under construction and slated for opening in early 2008. The Jumana Tower is 52 floors of 1, 2, and 3 bedroom apartments and the Mahara Tower will have 55 floors of residences. These luxury high-rise towers are currently taking orders for new owners.
Services provided:
3D Modeling, Clash Detection and Resolution, Quantity Take Off
Client | Al-Futtaim Carillion |
---|---|
Built-up area | 850,000 sq.ft |
Location | UAE |
Yas Marina Abu Dhabi Hotel is located within the Yas Marina Circuit, Abu Dhabi. It is the first new hotel in the world to be built over an F1 race circuit With a built up area of 85,000 Square Meter. The hotel embodies various key influences and inspirations ranging from the aesthetics and forms associated with speed, movement and spectacle to the artistry and geometries forming the basis of ancient Islamic art and craft traditions, a perfect union and harmonious interplay between elegance and spectacle. The hotel has 499 Rooms, 75 suites and 7 Restaurants.
Services provided:
3D Modeling, Clash Detection and Resolution, Quantity Take Off, Construction Simulation
Client | Bhawan Engineering Company |
---|---|
Built-up area | 962,000 sq.ft |
Location | Oman |
The new terminal at Muscat International Airport would be completed by 2014 and will have the capacity to handle 12 million passengers annually. Further expansions planned in three subsequent phases will ultimately boost the airport’s annual capacity to 24, 36 and 48 million passengers when the demand is required. The expansion built up area is 396,200 with North, South & West piers, a passenger transit and a Traffic concourse. Three new runways have been included in the existing airport.
Services provided:
3D Modeling, Clash Detection and Resolution, Quantity Take Off
A lot of BIM modeling work is outsourced to countries in Asia. Your contracting partner might be a company in the UK, Germany, Italy, or The Netherlands, but most of the work is probably not done by them. So why not use our capacity directly? We offer you the same professional online Project Management Tool.
If the revisions are due to modeling mistakes on our side, there will of course not be any fee.
If the revision is caused by wrong input, there may be additional costs. Small changes can be free of charge.